Origin Energy CSG Projects. (QLD, SA, WA,) E&I
Name of Principal Origin Energy Ltd.
Engineer Origin Energy
Project Origin Energy CSG Projects. (QLD, SA, WA,) E&I
Locations Spring Gully (QLD), Fairview (QLD), Peat (QLD), Talinga (QLD), Rolleston, (QLD), Myall Creek (QLD), Newstead (QLD), Wallumbilla (QLD), Yellowbank (QLD), Sardine Creek (QLD), Katnook (SA), Beharra Springs (WA)
Southern Cross Project Scope E&I Installations of CSG Main Compression Production Facilities, Field Compression Facilities, TEG units, including LV, Control & Instrumentation, MCC Buildings, Cabling, Cable Ladder, Electrical Equipment, Instrumentation, Instrument air / gas systems, Hazardous Area Installation, Lighting & Small Power, Earthing, Lightning Protection, Verification, Testing & Precommissioning and Commissioning assistance.
Time 2004/2007
Southern Cross Value Add Southern Cross Electrical Engineering ensured a flexible approach to the contract works and schedule and placed safety and progress at the forefront of the priorities. The project team was proactive in driving the projects forward to ensure the clients requirements were met in a timely manner in remote site environments with transport constraints. Constant communication with the client resulted in many of SCEE recommendations for design alterations being adopted and as a result effective completions were achieved. All works were completed accident and injury free.

 

 

Subscribe

Receive: