SCEE completed various electrical installation and pre-commissioning works for lines 1-6  at Sino Iron Ore Project located at Cape Preston, in the Pilbara, west of Karratha WA.

  • Client: Citic Pacific Mining (CPM)
  • Status: Completed
  • Value: $100 Million
  • Duration: Jul 2014 – Feb 2016
  • Capabilites: Construction
  • Market: Resources – Mining, Oil and Gas

These works included the electrical, control and instrument installation for the below:

  • Stockpile underground corridor
  • AG mill motor and winding connection
  • Test for the winding welding
  • Pebble crusher, ball mill and conveyors
  • Primary and secondary magnetic separator areas
  • Concentrate thickener area and flocculant plant for concentrate thickener area
  • Tailings thickener area and flocculant plant for tailings thickener area
  • Tailings pump station area
  • Process water pump station area
  • Environment water dam and pontoon pump station area
  • Raw water dam and pontoon pump station area