SCEE completed various electrical installation and pre-commissioning works for lines 1-6 at Sino Iron Ore Project located at Cape Preston, in the Pilbara, west of Karratha WA.
- Client: Citic Pacific Mining (CPM)
- Status: Completed
- Value: $100 Million
- Duration: Jul 2014 – Feb 2016
- Capabilites: Construction
- Market: Resources – Mining, Oil and Gas
These works included the electrical, control and instrument installation for the below:
- Stockpile underground corridor
- AG mill motor and winding connection
- Test for the winding welding
- Pebble crusher, ball mill and conveyors
- Primary and secondary magnetic separator areas
- Concentrate thickener area and flocculant plant for concentrate thickener area
- Tailings thickener area and flocculant plant for tailings thickener area
- Tailings pump station area
- Process water pump station area
- Environment water dam and pontoon pump station area
- Raw water dam and pontoon pump station area