SCEE Electrical LNG
< Back to projects

CHEVRON WHEATSTONE LNG

Location: Onslow, WA
Market: Resources – LNG
Performed by: SCEE Electrical

Scope of Work:

KSJV (50:50 joint venture between SCEE Electrical and Kentech) was engaged by Bechtel to complete the electrical and instrumentation installation services for the downstream portion of the Chevron-operated Wheatstone LNG processing facility.