COLLIE BATTERY ENERGY STORAGE SYSTEM

Client: Synergy
Location: Collie, WA
Market: Renewables
Capabilities: E&I Construction

In May 2024 SCEE Electrical was awarded the Balance of Plant (“BOP”) contract for Synergy’s Collie Battery Energy Storage System, a key project in Western Australia’s decarbonisation strategy, supporting the transition from coal to renewable energy.

The scope includes civil and structural works, advanced firewater systems, extensive cabling, battery installations, and the construction of key infrastructure such as kiosk substations and switch rooms. SCEE Electrical has subsequently secured a contract variation for the 330kV Switchyard Package, which expands the BOP contract to include civil works, overhead line gantries, transformer installations, and integration with Western Power’s SCADA system.