RUDATA SYD053 DATA CENTRE

< Back to projects

Location: Huntingwood, NSW
Market: Infrastructure
Performed by: Heyday Group

Scope of work:

The project consisted of a purpose built data centre building known as SYD053 and has been built in six stages. The base building and associated infrastructure and external works including tanks and provision for future installation of chillers. There are a number of plantrooms and associated support rooms including office areas, security rooms, breakout rooms, lifts, loading dock, store rooms generator rooms, fire rooms, plant yards and the like. SYD053 is located adjacent to SYD051, which is an existing operational facility. These works included the provision of a link between the two buildings such that the operational access to the SYD053 is via the existing SYD051. Heyday’s scope included high voltage systems, low voltage systems, generators and UPSs.